AIR : Construction Site : Construction Site September 2001

1st September 2001
Supports have now appeared in the main car park, close to where the AIR lift hill is being built.
1st September 2001
More steel for the lift hill/first drop.
1st September 2001
What is this? We have no idea.......
1st September 2001
More supports on the grass, shows how well the supports will blend in with the surroundings.
1st September 2001
A few more bits of steel.
1st September 2001
The construction crew are now preparing to install the supports for the lift hill and first drop.
1st September 2001
A curved track section ready to be installed.
1st September 2001
Some small supports in the lower car park.
1st September 2001
The concrete roof of the first tunnel is now being placed, suggesting that track has been placed. Lift hill motors are also being installed.
1st September 2001
A view across the top of the tunnel towards the station.
1st September 2001
In the background, part of the track which includes the switching mechanism for the dual station.
1st September 2001
One of the first pieces of lift hill supports is now installed and ready.
1st September 2001
The crane is being used to install the tunnel track pieces, and the roof for the tunnel itself.
1st September 2001
A close up of the front of the station shows where the two station tracks meet.

9th September 2001
Looking across the site from the monorail, with the steel roof of the station being constructed.
9th September 2001
The top of the newly constructed lift hill. Only a couple more pieces are left to install.
9th September 2001
An overall view shows how AIR towers above Nemesis.
9th September 2001
The track emerges from the tunnel underneath the monorail track.
9th September 2001
This shows just how close the track gets to the monorail.
9th September 2001
An overall view of the lift hill.
9th September 2001
Looking at the front of the station, now being constructed so the building above can be built.
9th September 2001
The rear of the station. The transfer track is still waiting to be installed.
9th September 2001
Looking from the station towards the lift hill.
9th September 2001
Heavy duty equipment is being used by the construction team during the night to build the lift hill.
9th September 2001
The roof of the station under construction.
9th September 2001
A wider shot of the station being constructed.
9th September 2001
More supports in the top car park to finish off the lift hill and turn around.
9th September 2001
The picnic area in Forbidden Valley has been fenced off, although no work has started yet.

15th September 2001
The top of the lift hill is now in place.
15th September 2001
A wider shot of the complete lift hill.
15th September 2001
The top of the lift hill as seen from Nemesis line.
15th September 2001
The initial drop is next to be installed.
15th September 2001
These supports have been placed where the first inversion occurs.
15th September 2001
Another shot of the new supports.
15th September 2001
Track is waiting to be installed, probably for the first inversion.
15th September 2001
Supports are in place for the turn around.
15th September 2001
Further track pieces in the car park for the initial drop and turn around. Expect these to be installed before next weekend.
15th September 2001
More track pieces.
15th September 2001
And a few more....
15th September 2001
In Forbidden Valley, work has now begun on the site of the old picnic area.

21st September 2001
The lift hill is just about done now.
21st September 2001
The initial drop and first turn around are now in place.
21st September 2001
Here the track banks steeply into the trees
21st September 2001
And the track changed colour before it drops underneath the monorail
21st September 2001
And back out the other side
21st September 2001
And up into the first inversion, seen from the opposite side of the site.
21st September 2001
The first inversion is now almost complete.
21st September 2001
A closer look at the inversion.
21st September 2001
The inversion dominates the skyline in Forbidden Valley
21st September 2001
Further track waiting to be installed.
21st September 2001
Compare the track size to Mac.
21st September 2001
The lower chassis of Dino Dancer is now located in the picnic area of Forbidden Valley.

28th September 2001
All of the track up to the entry to the second tunnel is now in place.
28th September 2001
The station roof/shop floor has now been poured too. Building will progress here over the next few weeks.
28th September 2001
A closer shot of the track as it races up the hill. It goes quite high. You will be lying on your back here.
28th September 2001
Another inversion takes you back into the flying position before you enter the second tunnel.
 
 
 
 
Visit the ATA Discussion Board - Click Here

By using this site, you are agreeing to these Terms and Conditions
All content is owned by Alton Towers Almanac unless otherwise stated. Everything on this website is the view of its respective author, and not those of Alton Towers or any of its associated companies.

This site is unofficial. Visit the official site here.

Go Button Search Button