Another view of the entrance
to the first tunnel, and most of the concrete has now
been poured.
|
|
Enormous support footers
are now all over the site. Expect these footers to be
covered by theming by opening day next year.
|
|
Work on the
first tunnel looks almost complete. |
|
The iron work
for another footer, waiting to be placed, and concreted
into the ground. |
|
Tunnel work
must now be almost complete, with soil now being placed
into the sides to fill in the gaps between walls and ground. |
|
30th June
2001
No further work seems to have taken place on the entrance
to the lift hill tunnel section, although work is now
going on in the station area. |
|
30th June
2001
In the loading station area, concrete is now appearing.
Note how the middle section seems to be seperated away.
Perhaps a different level of concrete in the middle of
the station for machinery or perhaps theming. |
|
30th June
2001
An overall view of the lift hill tunnel shows that soil
has been used to fill in the edges of the concrete, and
work can be seen going on in the loading station. |
|
30th June
2001
It appears that the lift hill tunnel now is just awaiting
steel. |
|
30th June
2001
The large seperate section of the tunnel waiting for coaster
machinery and electronics. |
|
|